Home / FAQ
Clear answers to the questions we hear most about solar panels, batteries, installation, maintenance and payments. If yours is not here, our engineers are a message away.
Still have a question?
Most concrete, metal and tiled roofs can host panels. What matters is unshaded area, structural condition and orientation. We confirm suitability during a site survey; often a few photos are enough for a first opinion.
It depends on system size, your consumption pattern and tariff. A system sized to your daytime load can offset a substantial share of grid purchase. Your proposal includes a monthly generation estimate so you can see the expected reduction before committing.
Ideally twelve months of electricity bills, photos of your roof and distribution board, and an idea of any future loads such as air conditioners or an electric vehicle.
Quality panels are designed for 25 years or more of service, with performance warranties guaranteeing a set percentage of rated output over that period. Inverters typically need replacement once during the panels’ lifetime.
Most homes are installed in one to two days once materials arrive. Commercial projects are phased and usually take two to six weeks depending on size and access.
We need access to the roof, the distribution board and the inverter location. Someone should be available at the start and at handover, but you do not need to stay all day.
Only briefly, while we connect the inverter to your distribution board. We agree the timing with you in advance so that it causes minimal disruption.
Yes. Where utility approvals, net-metering applications or building permissions are required, we prepare the technical documents and guide you through the process.
On-grid systems shut down automatically during outages for safety. To keep power during a cut, you need a hybrid inverter with a battery, which isolates your backup circuits from the grid.
We install lithium iron phosphate (LFP) batteries for their safety, long cycle life and tolerance of high temperatures.
It can, but air conditioning draws a lot of power, so the battery and inverter must be sized for it. Many clients choose to back up essential circuits only and run heavy loads directly from solar during the day.
It depends on dust, pollution and nearby trees. In dusty seasons, monthly or quarterly cleaning may be worthwhile; otherwise two to four times a year is typical. Monitoring data shows when soiling is costing you output.
Panels carry manufacturer product and performance warranties, inverters and batteries carry their own manufacturer warranties, and SolarUre provides a ten-year workmanship warranty on the installation.
Yes. We regularly inspect, repair and upgrade systems installed by others. The first visit includes a full health check so that we understand the system before taking it on.
Cost depends on system size, components, mounting structure and whether storage is included. Rather than publish generic prices that rarely match a real roof, we provide a fixed, itemised quote after the site survey.
Payments are usually staged: a deposit on order, a payment on delivery of materials and the balance after commissioning. The exact schedule is set out in your installation agreement.
Initial remote reviews are always free. For on-site surveys, any fee and how it is credited against your installation is stated clearly before we visit.
General answers only go so far. Book a survey and get a design, an estimate and a quote built from your own data.