Our Solar Installation Process, Step by Step

No mystery, no pressure. Here is exactly what happens from your first enquiry to the day your system starts generating — and what we do to keep it running afterwards.

Six Stages

From Enquiry to Energy

1

Enquiry and initial review

Share a recent electricity bill and a few photos of your roof. Within one business day, an engineer reviews them and tells you whether solar is likely to work for your building.

2

Site survey

We visit to measure the roof, check structure and access, record shading and inspect your distribution board and earthing. Most surveys take one to two hours.

3

Design and proposal

You receive a system layout, a monthly generation estimate, a single-line diagram and an itemised quotation — usually within 48 hours of the survey.

4

Approvals and scheduling

Once you approve, we order components, arrange any permissions or utility paperwork required, and agree an installation date that suits you.

5

Installation

Our crew installs mounting, panels, inverter, protection and cabling with full safety measures in place. Homes typically take one to two days; larger sites follow a phased plan.

6

Commissioning and handover

We test every string and protection device, configure monitoring, walk you through the system and hand over your documentation pack.

Supervisor in a hard hat discussing a project with a worker
White safety hard hat resting on a solar panel
48 hrs

Typical time from site survey to your written proposal.

Rows of solar panels under a cloudy sky
After Switch-On

The Work Does Not Stop at Handover

Your system is connected to our monitoring platform from the moment it is commissioned. We watch for drops in generation, inverter faults and communication losses, and we contact you when something needs attention — often before you would notice yourself.

We recommend an inspection after the first year and periodic cleaning based on your local dust conditions. Maintenance plans make this automatic, but you are always free to book visits only when you need them.

Your Paperwork

Documents You Will Receive

Proposal pack

Design layout, generation estimate and itemised quotation.

Installation agreement

Scope, timeline, payment stages and warranties in writing.

Commissioning report

Signed test results for every string and protective device.

Owner's manual

How to read your monitoring, isolate safely and care for the system.

Start Your Project

The First Step Takes Five Minutes

Send us a bill and a roof photo. An engineer will review them and reply within one business day.